AI Depletion Predictor

ForecastEngine

Live weather telemetry feeds our ML model to project groundwater depletion 90 days out, ward by ward, so residents know how much runway their borewell has left.

INSTRUMENT · CGWB + IMD
BENGALURU 12.97°N 77.59°E
MODEL REV 2025.1
Critical Depth
75m
Forecast Horizon
90 days
Data Sources
CGWB · IMD · Satellite
WARD:
90-Day Groundwater Depth Forecast Critical: 75m
Model Input Signals
Ward Stress Map
Safe Stressed Critical
Borewell Viability Forecast
Koramangala
This forecast is a prototype estimate derived from each ward's reported depth and 30-day trend (2025 data), combined with current weather conditions. It isn't a live, real-time model yet — future versions will use continuously updated, zone-specific sensor data for finer-grained accuracy.
Days to Critical Depth
Today Monsoon Critical
Weather Impact on Depletion
Action Plan — Extend Viability
Total viability gain if all steps taken: +0 days
Failure Probability (90-day)
Borewell failure probability
LowMediumHigh